thermische Abfallbehandlung
Selection of References:

Kran hebt Müll in den Kessel

2018 - lfd.KENOW,
Bremen
New installation sewage sludge incineration plant Bremen
New construction of a sewage sludge incineration plant with fluidized bed furnace.
W+G
2018 - 2018MVR,
Hamburg
Heat Extraction and Dimensioning of a District Heating Plant WtE Rugenberger Damm.
Concept Development and Dimensioning of a District Heating Plant.
W+G
2017 - lfd.VWH,
Hamburg
Pump station Bahrenfeld
Concept Developement for Pump Station Bahrenfeld.
W+G
2017 - lfd.VWH,
Hamburg
Heat Transformation Plant Borsigstraße
Feasibility Check of Transformation Concept.
W+G
2018 - 2018MVV,
Leuna
Heat recovery TREA Leuna
Approval planning and support of tendering and contracting for the supply of district heating from the flue gas of a waste incineration plant.
W+G, fbi, T&N
2016 - lfd.RBB,
Böblingen
Retrofit flue gas treatment WtE Bölingen
Overall engineering of the retrofit of the wet flue gas treatment system to a dry flue gas treatment system.
W+G
2016 - Biel,
Bielefeld-Herford
Replacement waste cranes WtE Bielefeld-Herford
Pre-engineering for renewal of the waste cranes
W+G, fbi
2015 - 2017AVG,
Hamburg
Extension of container storage Hazardous Waste Incineration Plant
Approval planning for the extension of the conatiner storage for hazardous waste.
W+G, fbi
2015 - 2017VAT,
Hamburg
Electric Boiler Cogeneration Plant Karoline
Design, tendering and site supervision for the renewal of the electric boiler and high voltage transformer including capacity increase.
W+G, fbi
2014 - 2018Synthos,
Oswiecim, PL
Waste-to-energy plant with co-incineration of sewage sludge
EPCM contractor for the new installation
W+G, fbi
2014 - 2016AVG,
Cologne
Waste-to-energy plant Cologne, 2nd energy block
Retrofit of a steam turbine and an air cooled condenser: design, approval management, tendering and procurement, support in detailed design, construction supervision and acceptance
fbi, T&N, Selck
2013 - 2014AVG,
Hamburg
Optimisation of the flue gas treatment Hazardous Waste Incineration Plant
Study for prevention of emission peaks and optimisation of the flue gas treatment including measuring program
W+G, T&N
2013 - 2015VAT,
Hamburg
Cogeneration Plant Power Plant Wedel
Assistance especially regarding district heating systems and documentation of the new plant
WG
2012 - lfd.BWB,
Berlin
Sewage Sludge Incineration Berlin-Ruhleben
Implementation of all phases of HOAI (1 to 9) to renew and upgrade all wet flue gas cleaning, including all peripheral equipment, and to redesign and construct a combustion temperature control plant in the fluidized bed furnaces.
W+G
2010 - 2015REAL,
Luzern, CH
Waste-to-energy plant Luzern (RENERGIA)
Winner of the idea competition, EPCM contractor for the new installation
W+G, fbi, T&N
2009 - 2010AVEA,
Leverkusen
New installation of pre-treatment plant WtE Leverkusen
Tendering and implementation of the pre-treatment plant with a mobile system
W+G, fbi
2011 - 2016HEB,
Hagen
Turbine for waste-to-energy plant Hagen
Overall planning including air cooled condenser and turbine house, tendering in lots and site supervision
fbi, T&N, Selck
2008 - 2011AVEA,
Leverkusen
Waste-to-energy plant Leverkusen, Turbine 3, ACC and Turbine House
Overall planning, tendering in lots and site supervision
W+G, fbi, Sladek, Selck
2007 - finBEG,
Bremerhaven
Extension and renewal of district heating system of WtE Bremerhaven
Basic engineering, tender specification, implementation management including construction on site at the WtE plant Bremerhaven
W+G, Thies Hansen
2006 - finBEG,
Bremerhaven
Replacement investment WtE Bremerhaven
Appraisal of the existing plant in regard to lengthening the useful life of 20 years in combination with the planned replacement investment of the incineration line.
W+G
2006 - 2009swb,
Bremen
Refuse-derived fuel plant (MKK) Bremen
EPCM contractor for new installation fitted in existing structures
W+G, fbi, T&N, Selck, Sladek
2005 - 2018Biel,
Bielefeld- Herford
Capacity increase WtE Bielefeld-Herford
Basic design, preparation of tender documents and contract award, implementation including site management
W+G
2005 - 2008AZV,
Pinneberg
Sewage sludge incineration Hetlingen
Basic evaluation and basic engineering for new installation
W+G, fbi
2002BRAVE,
Wijster, NL
Waste-to-energy plant Wijster
Design and tendering of the main lots: boiler, flue gas treatment, turbine/generator and air cooled condenser
W+G, fbi
2001ANO,
Bremen
Waste-to-energy plant Bremen, waste cranes, building renovation
Planning, tendering, procurement and construction supervision for new waste cranes as well as building renovation
W+G, fbi
2000BMU,
Berlin
Guideline animal meal incineration
Preparation of the guideline "Technical Requirements and General Recommendations for the Treatment of animal meal and animal fat in incineration plants"
W+G, Dr. Nottrodt
1999Sødertålje,
Schweden
Chief Inspector
Acting as a neutral "Chief Inspector" for the implementation of a performance ride of a grate for high calorific secondary fuels from waste
W+G, Dr. Nottrodt